Overview
Cost-optimization study yielded 14% structural saving by re-rationalizing the lateral system and slab profiles.
Engineered end-to-end by SPEC Z — from schematic structural concept through coordinated BIM delivery and issued-for-construction documentation. Every load path validated, every interface coordinated, every detail built to be built.
- Location
- Dubai, AE
- Year
- 2025
- Typology
- Mixed-use
- Scale
- G+38
- Discipline
- Cost Optimization
Next project
